Have you’ll seen the Dirt Time in Alaska episodes 10, 11, and 12?  They were filmed in Fairbanks back in Spring of 2006 on the Chena River.

The three-day training workshop had one-day classroom instruction and two days with actual hands-on implementation.  It was sponsored by the USFWS to help landowners whom were having problems with accelerated shoreline erosion along the Chena River. A very proactive landowner, Jeff Harrison,  provided his property for the demonstration, equipment rental, and he purchased some of the materials. I got to operate a nice little John Deere Excavator which was a treat.

A few Erosion Control Manufacturers contributed to help making a Dirt Time episode. See /the-episodes/ . The class was based on the Environmentally-Sensitive Streambank Techniques outlined in recently published NCHRP Report 544.

The Lower Chena River is almost like a lake so the erosional forces at work involve wave action, primarily from the riverboats operating in the spring and summer, and to a lesser degree, ice from the spring breakup. Compounding the problem is urban development which had resulted in removal of the natural riprian vegetation.

The techniques we chose for the hands-on repair were:

1. Cori Rolls w/ Brushlayering

2. Live Siltation w/ Coir ‘BioD Blocks’

3. Vegetated Rock Protection

4. ‘Deltalok’ Vegetated Geoberm Bags

 See below Photos of Riverboat waves flowing perpendicular to shore!

About 40 people attended the workshop, including members of USFWS, AK Department of Fish and Game, Alaska Department of Conservation, and USACE.  It was a wonderful spring day to work, in fact sunburn was a risk.  Most of the techniques we demonstrated could be constructed by hand labor but we did utilize the excavator to build a relatively-stable toe/terrace (dictated by water surface elevation at the time) on which to start the coir and soil bag constructions.  The Coir Rolls (and Bio D Blocks)  and the Soil Bags were designed to be the “structural elements” which will resist wave splash erosion.  The backfill with brushlayering  was intended to provide the gravity and reinforced (with branches, roots, coir tiebacks etc.) soil fill.  The Live Siltation is a “modified brush layer” which have the branches slanting upward more – designed to provide roughness during high water.   

A problem we encountered was something I had never considered – seasonal permafrost. The wooden anchors needed for the Coir constructions could only be driven in about a foot before hitting complete and total resistence. By the end of the summer, the permafrost will have melted even more and the stakes are simply driven into mud! We decided to double up on the wooden stakes but the structural integrity really came from the brushlayering, tiebacks and the gravity of the fill.

The Vegetated Soil Bags were geotextile bags filled with granular soil and organic (compost) matter. The patented element of this product is an approximately 4″ x 8″ heavy duty plastic plate with spiked on each side – intended to keep the bags from slipping when stacked upon each other. Again, we used willow brushlayering between each lift.



Interestingly, several years ago I heard rumors that these methods failed in the first year! Needless to say I was disappointed but hoped that the professionals in the area could look at the big picture and beneficially incorporate some of these techniques into more ‘rigid’ designs as needed.

However, I recently received a current photo of the site and GUESS WHAT? The streambank and the project, including the techniques, have performed magnificently! I don’t know how the rumors got started but the photos below show how well the site has performed. I called Jeff Harrison the other night and he verified that all the techniques we tried, with the exception of LWD anchored down with duckbills, have performed great! He reports that he had some 6-9″ rock left and placed it in a few places. He commented that in hind-sight, he would have “battered the coir walls back a bit” and while the soil bags have also “held up great but they are not as attractive.”

Picture below is of our partner in Dirt Time – James Swirsky filming an episode.

(More on James in Footnote)

See the site photos taken 7 years later, July 16, 2013. Jeff reports that the willows have formed a hedge which he prunes. You can see in the closeups where he deposited some rock. Just think, after 7 years of wave splash and weather!! A disclaimer – Jeff reports that there has not been a huge ice breakup in several years but nothing can defend against that!

Photos below were taken on July 16, 2013!

Footnote: James and I went on to film even MORE Dirt Time Episodes.

James Swirsky and Lisanne Pajot won a Sundance Film Festival Award for their Documentary film, Indie Game: The Movie in 2012!

Check it out at https://buy.indiegamethemovie.com.

And for more information on Our Chena River Bioengineering Project and Dirt Time episodes, please check us out on Facebook: https://www.facebook.com/WatchYourDirtTV

And visit our store at: https://watchyourdirt.bigcartel.com/

Thanks for reading!

John

Redding California and it is Fall of 2000.  SWAG (Sacramento Watersheds Action Group) a non-profit formed in 1996 to restore the salmonid habitat in Sulphur Creek (an important (spawning and rearing habitat-wise) a seasonal urban stream, has started to “Day Light” the Secret Canyon Stream.

Our Sulphur Creek Watershed Analysis and Action Plan (1998) documented the work needed in the watershed – and if this old Road Crossing (circa 1938) failed it could fill Sulphur Creek with even more sediment and compromise the “in stream” restoration work that SWAG was doing.

As Project Manager for SWAG I wrote a grant request for $15,000 from CA Department of Water Resources Urban Stream Program.  However, I had badly under estimated the extent of the earthmoving work needed and the permit and planning with the City of Redding was also costly and unanticipated.  Secret Canyon was “filled-in” back in 1938 to build the Shasta Dam Conveyor Belt and now 60 years later the 36” culvert was rotted and over 10,000 CY of fill was threatening to blow out.

 Fig. 1- The Conveyor Belt over North Market Street, circa 1938.  Secret Canyon is to the rear, behind telegraph pole.  The sign says “The World Longest Conveyor Belt” used to transport over 3 million CY of rock, 11 miles, to build Shasta Dam!!

Fig 2 – View of failing culvert before “daylighting” began.

Fortunately SWAG had the support of the Sulphur Creek CRMP and Turtle Bay Museum and we had MOU agreements with Shasta College to do much of the work as part of our work site-learning program – this project was “tailor-made” for our Heavy Equipment Operations Class and my Watershed Restoration Class.   Thankfully John Livingston (HE Operation Instructor) and my self had some dedicated student who just wanted to operate bulldozers and RESTORE the land – these students worked faithfully for over 10 days, 10 hours per day, just “pushing dirt”.  Chris Cross, a local Trinity County Contractor donated lots of hours on a huge PC 400 Excavator.

 

 

 

 

 

 

 

 

 

 

Then my class and community volunteers performed the erosion control work using native grasses, native straw mulch, bioengineering, and planting native container plants provided by Turtle Bay Museum and Arboretum.

Fig 5 Community Planting days helped

instill watershed stewardship

Fig 6  The “New Daylighted Stream” is treated

with bioengineering techniques like fiber rolls,

brushlayering of willow and elderberry and cottonwood.


Figure 8  The over 10,000 CY removed from the

channel was placed back on the hill cut from which it came. 

Land recontouring is an affective restoration tool. 

See Landforming by H. Schor and D. Gray

One of the coolest bioengineering techniques is the “Live Smile”.  I learned this one from a very experienced “Bioengineer and Teacher” David Polster, from Vancouver Island, BC.  David showed my how willow branches can be constructed as a woven fence but shaped as a catenary curve.  This shape is extremely strong and David has used them successfully to stabilize slumping shallow slope failures.  Below are pictures of David’s Live Smiles that I took up in BC.  Well, our fill that was placed steeply (1.5:1 and dozer compacted) had some shallow failures during the first winters heavy rains.  Our Shasta College class stabilized the slumping areas with Live Smiles.

Figure 12 Students installing Live Smile to retail small slumps on steep fill slope

What is really amazing is that the Live Smiles have continued to grow and provide stability after 14 years!  That is 13 very HOT, dry Redding summers!!  These willows are far removed from a stream or a spring or …  so just remember in the future when considering Salix sp. As an upland restoration plant!  As David Polster so eloquently points out is his treatise about how our restoration goals should include Successional Reclamation concepts – willow is a successional reclamation plant, it is a pioneer species in many regions coming in initially after fire, landslides etc., holds the soil in place with its fibrous roots, then “gives up” the now stabile ground as successional species take over.  An important concept indeed!

This project and many more are available in our NEWLY-Published ‘Bioengineering Case Studies’, 2014, W. Goldsmith, D. Gray, J. McCullah

Please let us know if you like these blogs.  You can subscribe or just let me know and I’ll put you on (or keep you on) my mailing list.