07 Oct The Dirt Time ‘Complete Works’
The Dirt Time Complete Works is now available!
The Complete Works is divided up into two DVD sets – The BMP (Best Managed Practices) set and the BioEngineering Set. They are available together for only $299 or separately for $175.00 each.
Order them now at the WatchYourDirt Shop (Click Here).
Here’s what is on each of the four discs…
BMP Set Disc One
• Hydromulch
• Hydromulch on a large area cover up
• Compost Blanket
• Blown Straw
• RECP / Erosion Control Blankets
• Silt Fencing
• Sediment Ponds
• Theory of Ditch Check
• Gravel Ditch Checks
• Gravel Bag Ditch Checks
• Fiber Rolls Ditch Checks
• Triangular Silt Dike Ditch Checks
• Enviroberm Ditch Checks
• Hay Bales: The Good & The Bad
• Straw Talk – A discussion about different straw types and straw theory
BMP Set Disc Two
• Articulate Concrete Blocks
• Low Water Crossings
• Stabilized Construction Entrances – Traditional
• Stabilized Construction Entrances – Rumble Strips
• Turf Reinforcement Mats in a Channel
• The ‘Green Armor System’
• Energy Dissipators – Traditional (rock)
• Energy Dissipators – ScourStop
• Extreme Slope Stabilization
• Extreme Slope Stabilization – Update (6 months later)
BioEngineering Set – Disc One
The Willow Creek Project (Follows a large Scale Riverbank stabilization from start to finish), detailing…
• Rock Vanes
• Longitudinal Peak Stone Toe Protection (Rock Toe)
• Slope Prep & Trackwalking
• Soil Nailing
• Hydromulching
• Fiber Rolls
• Gully Repair
• Live Willow Staking
• Live Siltation
• Modified Brush Layering
• Soil Flaps
• Slope Stabilization
BioEngineering Set – Disc Two
• Rock Vanes
• Large Woody Debris
• Live Pole Drains
• Modified Brush Layering (2)
• Vegetated RipRap
• VMSE (Soil Wrapping)